Volume, Peak discharges and Froude Number of Debris-Flow Surges: 10 Years of Monitoring on the Réal Torrent (France) - INRAE - Institut national de recherche pour l’agriculture, l’alimentation et l’environnement Accéder directement au contenu
Communication Dans Un Congrès Année : 2023

Volume, Peak discharges and Froude Number of Debris-Flow Surges: 10 Years of Monitoring on the Réal Torrent (France)

Résumé

This work presents a summary of data on debris-flow monitoring stations focusing on the surge scale rather than full-scale debris-flow event (several fronts and surges with intermediate diluted flows). Surge-scale debris-flow data are not easily accessible for modellers but would be very beneficial for the community. A summary of the data processing protocol is offered, and its application to the monitoring station of the R?al Torrent is described (drainage area: 2 km 2 , SE France). Investigated bulk surge features are volume, front height, peak discharge, and Froude number. This investigation leads to statistical distributions of these parameters on 34 surges gathered from 2011 to 2020. Their volumes are typically a few thousand cubic metres, their peak flow height is 1 to 2 m, their peak discharge is a few dozens of cubic metres per second and their Froude number is near critical. Results drawn from this work will be a great asset for modellers to better feed their numerical experiments with realistic, field-driven features.
Fichier principal
Vignette du fichier
Lapillonne et al. - 2023 - Volume, Peak discharges and Froude Number of Debri.pdf (2.29 Mo) Télécharger le fichier
Origine : Fichiers éditeurs autorisés sur une archive ouverte
Licence : CC BY - Paternité

Dates et versions

hal-04240853 , version 1 (13-10-2023)

Licence

Paternité

Identifiants

Citer

Suzanne Lapillonne, Firmin Fontaine, Guillaume Piton, Vincent Richefeu, Frédéric Liébault. Volume, Peak discharges and Froude Number of Debris-Flow Surges: 10 Years of Monitoring on the Réal Torrent (France). 8th International Conference on Debris Flow Hazard Mitigation (DFHM8), Jun 2023, Torino, Italy. pp.03016, ⟨10.1051/e3sconf/202341503016⟩. ⟨hal-04240853⟩
20 Consultations
21 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More