Résumé
The French Overseas Territories experience big sanitations problems and have to comply with both French and EU regulations. Vertical flow constructed wetland (VFCW) appear well adapted to the context of these regions, but their adaptation to tropical climate requires new guidelines to be defined (area needed, number of filters, species of plants, material to be used …). To this end ATTENTIVE project was build up in the French Antilles with local water offices and supported by the national water authorities. Three different VFCW fed with raw wastewater were built in Martinique and Guadeloupe and are now under monitoring. While the 3 plants are actually in operation, this paper will focus on Taupinière plant (Martinique), sized for 900 p.e., in operation since October 2014. The treatment plant is composed of aunsaturated/saturated vertical flow constructed wetland, receiving raw domestic wastewaters, followed by a simplified trickling filter.The first stage is 0,8m²/p.e. with two filters in parallel (360 m² each), with a 40 cm unsaturated first layer of 2/4 mm gravel, a 15 cm transition layer of 11/22 with intermediate passive aeration pipes and a 60 cm saturated layer at the bottom made of 20/40 pea gravel. The trickling filter(116 m²)is composed of 150 cm of pumice stones. The sludge accumulated at the bottom of the trickling filter is sent back to the first stage.A recirculation loop is implemented on the trickling filter. Before the outlet, effluent passes through UV. The regulationobjectives is to achieve 90% removal for COD, BOD5 and TSS, 80% for TKN, and less than 1000 unit per 100 mL for E.coli and intestinal streptococcus. Nevertheless, the monitoring look after optimal operation to increase TN removal rates as well as the maximum loads that can be treated. The monitoring consists on classical daily composite samples at each treatment stages (30 campaigns) as well as online measurements. The later aim at measuring flows, climatic conditions, and COD, BOD5, and Nitrate (UV/visible analysis) at each treatment stages. Three different loading phases has been implemented from 30 % of the nominal load to 150 %. The paper will present performances of this compact (less than 1 m²/p.e.) treatment system in both dry and rainy season and discuss the optimization of TN removal as well as the footprint reduction with the high loads that can be implemented.